Can CFST be deployed in Artificial lift designed completions?

Yes, However, some precautions in the design are required. Non-metallic centralizers on the sucker rods; for both beam pumping and PCP installations. A limited deviation would be an advantage and result in prolonged life. Soft start or VSD in ESP is a must as it will reduce residual torque on the composite tubing when starting the downhole motor. Gas lift completion is no different from metal tubing.